The Build Loop

How an objective becomes working software: the stages, who owns each decision, what runs mechanically, what needs judgement, and what reaches the operator.

This page is the authority on the loop. Coordination owns transport and recovery beneath it, Plan Review owns the charter gate at its head, and Verification & Quality owns the review gate's internals. Where any of those describes a stage this page also describes, this page wins.

Status

Designed, not built. The charter gate, worktree isolation, the review gate and the reviewer-independence constraints exist today. Reconnaissance, the skeleton stage, slice planning, the gate system, the finding channel and the machinery budget do not. Driven live against real providers, the current loop has never reached assembly.

The problem

The loop as built is plan, build, review, assemble. The whole tree is planned in one pass from prose, the leaves are built concurrently, and an agent reconstructs the union at the end by reading its children.

Four mechanisms make parallel software engineering converge rather than diverge. The loop has none of them.

Mechanism Why it is load-bearing Today
Probe the unknown first The plan dies on facts nobody had The planner researches inside its own session; findings are ephemeral and reach nothing
A contract before the work Parts are only independent if their seams are real Contracts are prose. The merge brief concedes they "do not survive" implementation
A trunk that stays green Integration risk is paid down continuously Integration is one phase, at the end, once
Work feeds back to the plan Discovery is the point of doing the work No path exists. A leaf that learns the plan is wrong has nowhere to say so

The consequences are measured, not inferred. One assembly spent 1,600,399 prompt tokens against 2,229 completion tokens: 99.86% of its budget re-reading children it had already read, because each read stays in the conversation and is re-sent every later turn. Assembly cost is quadratic in what it reads and fan-in grows with depth, which is indistinguishable from depth itself failing.

A second defect compounds it. A single unit's tests are written by the unit that wrote the code, so they pass by construction, and nothing between a leaf and the root ever runs the pieces together.

Shape

flowchart TD
    C[Charter<br/>operator approves] --> R[Reconnaissance<br/>durable findings]
    R --> S[Skeleton + gates<br/>contract as code]
    S --> P[Slice plan<br/>next slice only]
    P --> B[Build<br/>leaves in worktrees]
    B --> G{Deterministic gates<br/>system, cached}
    G -- red --> B
    G -- green --> V{Judgement review<br/>diff, line-anchored}
    V -- reject --> B
    V -- approve --> M[git merge<br/>no agent]
    M --> T{Trunk gates}
    T -- red --> RV[revert + finding]
    RV --> B
    T -- green --> I[Increment<br/>it boots, operator sees it]
    I --> P
    B -.finding.-> F[Finding channel]
    V -.finding.-> F
    G -.finding.-> F
    I -.misaligned.-> F
    F -.amend.-> S
    F -.re-slice.-> P
    F -.ask.-> C

The dotted edges are the mechanism the current loop lacks entirely. Everything can raise a finding, at any depth, at any time, and a finding is the only thing that changes the plan.

Architecture

OperatorJudgement (agents, tokens)Mechanical (system, no tokens)Finding channelStandards roleReconnaissanceSkeleton ownerSlice plannerBuild unitsReviewerInvestigatorGate runnerResult cachegit mergeTrunk gatesMachinery budgetIncrement boot keyed on check + tree + config shaduration + costapproved charterdurable factscontract + gate configslicecommitgate resultsapprovegreenrunning software + prosered trunkgate failuredefectblocked-by-factbudget breachgate is the defectsecond failurecontract-wrongre-sliceneeds-humanmisaligned

The left column costs tokens and produces judgement. The right column costs seconds and produces facts. Every arrow crossing from right to left carries evidence; no arrow crossing from left to right carries an unverified claim.

Two kinds of check

Almost every question about the loop resolves once these are separated.

Deterministic gate Judgement review
Examples format, lint, types, tests, coverage, dependency policy, build, boot is this right, done well, the thing that was asked for
Cost seconds, no tokens minutes, tokens
Repeatable yes, and cacheable no
Runs on every commit once per proposed change
Owner the system an agent

Nothing reaches a judgement reviewer until every deterministic gate is green. A reviewer spending tokens to notice that a file was never formatted is the most expensive linter ever built.

The system runs every deterministic check. Agents write tests; agents never report their results. An agent-reported pass is a claim, and the loop already says so in the words it hands back on rework: a claim that the tests pass is not evidence that they do.

Stages

Charter

Unchanged from Plan Review. An interview produces a charter with objectives and acceptance criteria; the operator approves it; that approval authorises the work and the spend behind it. Scope is the operator's decision at every autonomy level, including full.

Reconnaissance

A bounded stage before planning, answering only the questions whose answers would change the plan. Can this library do what the objective needs. What is already in the repository. What shape is the API that must be integrated with.

Output is a findings document, durable and versioned, and it is the set of facts the plan is permitted to assume. It is not code.

This is where a discovery that invalidates the approach is supposed to land: cheaply, before a hundred units are planned on top of it. Today that discovery happens at a leaf, four levels deep, with nowhere to go.

Reconnaissance runs again whenever a finding invalidates one of its facts.

Skeleton and gates

One agent, working serially, commits a compiling skeleton to the trunk:

  • module layout and type signatures
  • one pending test per acceptance criterion
  • the project's own gate configuration

The contract becomes code. A leaf's brief stops being a paragraph and becomes a signature plus a pending test that must pass. Two leaves implementing against the same skeleton touch disjoint files, so their union is a three-way git merge rather than a reconstruction.

Pending is what keeps the skeleton compatible with a green trunk. A test asserting a contract nobody has implemented yet fails, and a skeleton that committed a plainly failing suite would break the invariant the whole loop rests on before the first unit runs. So the gate configuration declares each criterion test pending, and the trunk suite reads a pending failure as green.

Pending is narrow as well as strict, and the narrowness is what stops it becoming a mute button. Only the declared failure is green: the assertion in the criterion test, failing because nothing implements the contract yet. Every other way that test can end stays red, because none of them is evidence the contract is merely unimplemented. A collection error means the skeleton does not import; an unexpected exception means it is wrong rather than absent; a timeout or a runner crash means nothing was measured at all. Reading any of those as green would let a skeleton that does not even load ship as a green trunk, which is the invariant this mechanism exists to protect.

Pending is strict in both directions too, which is the other half of the same contract. A pending test failing its declared assertion is green; a pending test that passes is red until the same commit clears its marker. A unit therefore cannot satisfy its contract and leave the marker behind for the next unit to inherit, and clearing the marker is the mechanical signal that the unit is done. A pending marker on a criterion no unit claims is a skeleton defect, caught at skeleton review while the whole contract is being read.

The gate configuration is part of the skeleton because a definition of done with nowhere to live is a definition of done nobody enforces. It carries the linter, the formatter, the test runner, the coverage floor, the dependency policy, and the command that boots the result.

The skeleton is small by construction, which is what makes it reviewable.

Slice planning

Plan the next slice, not the whole tree. A slice is the set of units that can run concurrently against the current trunk.

Depth becomes emergent rather than a parameter. Each slice is planned with everything the previous slice learned, so the moment of maximum ignorance is never the moment the whole structure is decided.

A static hundred-item tree planned in one pass is waterfall applied recursively.

Build

Each unit gets a git worktree off the current trunk commit and its own container. Unchanged from today, and this part works.

A unit is ready when the skeleton's pending test for it passes, its marker is cleared in the same commit, and nothing else broke. That is mechanically checkable and it is not a paragraph, which is the whole point: it is the one part of "done" a machine can decide alone.

Ready is not done. A ready unit still has to pass review, merge cleanly, and leave the trunk green, and each of those can send it back. Naming the two apart matters because they have different owners: readiness is the gates', and completion is the reviewer's and then the system's, exactly as the ownership table and the merge section below have them.

Gates

Every check is content-addressed on (check_id, tree_sha, config_sha) and cached. A leaf is a commit, so the tree hash is free.

Caching is not an optimisation here, it is what makes the trunk invariant affordable. Without it, N leaves merging in a slice run the full suite N times.

Gate results are attributable and signed by the runner. A reviewer reads them; it never runs the tests itself.

Review

The reviewer is shown three things: the diff between the leaf's head and the trunk commit it branched from, the cached gate results, and the acceptance criteria.

Reconnaissance findings are deliberately not among them. Recon feeds the skeleton, the skeleton is the contract, and the reviewer judges the diff against that contract, so the facts recon established have already been distilled into code by the time review happens. Shipping the raw findings as well would re-open the read-everything pattern that cost one assembly 1,600,399 prompt tokens against 2,229 completion, for information the contract already carries.

It reads, it runs nothing, it writes nothing, and it files one verdict with findings. The author fixes. A reviewer that edits becomes an author, and the independence the database constraint protects evaporates while the constraint still passes.

Reviewer selection and session narrowing are unchanged; see Verification & Quality.

Merge

No agent merges. On approval the coordinator runs git merge. Clean merge plus a green trunk suite completes the unit. A conflict or a red trunk is a finding routed to the author, with the conflict as its evidence.

Git's line-based merge invents conflicts between changes that do not collide: two units adding different functions to the same file overlap in line ranges. An entity-level merge driver, installed through .gitattributes and parsing with tree-sitter, resolves those without an agent. What remains is a real collision, which genuinely needs an author.

Trunk gates and the revert rule

The trunk is green at all times. That invariant is what makes concurrent leaves safe.

A unit that merges cleanly into a green trunk and turns it red owns that failure, because its change is the delta. It is reverted immediately, which restores the trunk in seconds, and its author receives a finding carrying the failing test and the sibling diff it collided with.

Where the author cannot resolve it, the finding is promoted to contract-wrong: the skeleton permitted two units to make incompatible assumptions, which is a planning defect, not an implementation one.

No merge algorithm detects this class. Generated unit tests detect roughly a third of semantic conflicts, so tests are necessary and not sufficient; the remainder is caught by the skeleton's intentional per-criterion tests and by review against the contract.

Increment

Every slice ends with the software booting, in a container, reachable.

For an operator who does not read code this is the highest-signal check that exists: an application that serves a page has cleared a bar no unit test does. It is also the only review artefact that needs no translation.

Ownership

Every decision has exactly one owner. Two owners is a silent override; zero is a deadlock. See Single-Owner Decisions.

Decision Owner Escalates to
What we are building operator, at charter never delegated
What the facts are reconnaissance re-runs on an invalidating finding
The contract skeleton owner operator on a second contract-wrong for one interface
What a slice contains slice planner operator when a finding empties it
Which gates apply derived from the declared capability's profile operator at skeleton review, when no profile fits and a project-local gate is drafted
Whether this is what was wanted operator, at the increment never delegated; no machine makes this one
Adding a check to a project-local gate any agent never
Editing a check a project-local gate already has operator, at skeleton review never
Adding a project-local gate operator, at skeleton review never
Tightening a central profile, promotion into one included the standards role, at catalogue review never
Loosening or removing a project-local gate operator, at skeleton review never
Loosening or removing a central profile the catalogue operator, at catalogue review never
Whether a unit is done gates, then the reviewer operator when review stalls, at supervised and stricter
Whether it merges the system the author, when the merge conflicts or the trunk goes red
Whether the machinery is healthy the standards role operator on a budget breach
Whether a gate earns its keep the meta-finding rule operator

The asymmetry in the gate rows is load-bearing. An agent blocked by a gate will always prefer to weaken it, so the ratchet turns one way, and it turns on the distinction between adding and editing rather than on anyone's judgement of which check is stricter. Adding is free because a configuration that only grows admits strictly less than it did; editing is not, because "this replacement is no weaker" is not a property the system can decide for arbitrary checks. The two operator rows are the ones an agent could otherwise use to walk the ratchet backwards: rewriting a check, and drafting a new gate nobody has read.

Scope bounds the free direction as tightly as the direction does. A project-local gate belongs to one project, so an agent adding a check to one costs that project a check its own operator reads at the next skeleton review. A central profile is not one project's: it is in force for every project that declares the capability, and none of those operators is in the room. So the addition rule stops at the project boundary, and every change to a profile, an addition included, is the standards role's at catalogue review. Promotion is the one path from a project into the catalogue, which is why a local gate that keeps recurring is promoted rather than an agent editing the catalogue from inside a build. Loosening runs the other way and stays an operator's on both sides, because a ratchet that turns one way is what this whole section is for; which operator follows the scope, the project's for a project-local gate and the catalogue operator for a profile.

Decisions are durable

Saying who owns a decision is half of it. The other half is that a decision, once made, stays made and stays findable, or a later unit that lacked the context quietly reverses it.

Every decision the table names produces an addressable record carrying its question, its answer, its owner, the charter objective it serves, the evidence it rested on, and the decision it supersedes when it replaces one. Records are immutable: a change is a new record naming its predecessor, so "what did we decide, and why did it change" is answerable rather than reconstructed.

Decisions travel with the work. A unit's brief carries the decisions in scope for it, so a leaf building against a contract is given the decisions that shaped that contract rather than re-deriving them.

Re-opening one is an action rather than a drift. A decision-stale finding names the decision and the new fact that invalidates it; at supervised and stricter the operator settles it, and at full it proceeds automatically but is recorded and reported in the increment.

serves is also what keeps the build anchored to what it is for. A decision citing no live charter objective is surfaced as a finding, which makes drift visible while it is happening rather than forty rounds later, and costs nothing to check because the citation is a required field rather than a judgement.

The gate system

Capabilities derive gates

A slice declares what it produces. The gate profile follows from that declaration; nobody decides it per project.

flowchart LR
    D[slice declares<br/>ui:web] --> PR[capability profile]
    PR --> G1[browser smoke]
    PR --> G2[accessibility]
    PR --> G3[bundle budget]
    PR --> G4[route renders]
    D2[slice declares<br/>service:http] --> PR2[capability profile]
    PR2 --> G5[contract tests]
    PR2 --> G6[boot check]
    PR2 --> G7[dependency policy]

A prototype forty rounds in that gains a web interface does not require anyone to notice that browser testing is now needed. The slice declares ui:web and the profile brings its gates. What an operator decides is whether a capability profile is right, once, when the profile is authored, and never per build.

Where a profile comes from, and what happens when none fits

No catalogue anticipates every shape of project, so the loop does not pretend to one. Gate configuration is layered.

Central profiles cover the shapes that recur: a web interface, an HTTP service, a command-line tool, a data pipeline. Each is authored by the standards role and reviewed once, at catalogue review, then reused by every project that declares its capability. This is where the weight sits, and it is why most projects need no gate authoring at all. It is also why nothing inside a build reaches one: a profile is shared, so a change to it is settled where every project it charges is in view, never at one project's skeleton review.

Catalogue review seats two authorities, and which one settles a change follows the ratchet rather than the venue. The standards role settles a tightening, because an addition needs no permission. The catalogue operator, who owns the catalogue rather than any one project, settles a loosening, because loosening is an operator's everywhere and no project's operator can speak for the others a profile charges. Naming that seat is what makes "operator only" executable on a shared profile instead of a word that resolves to whoever happens to be reading. Each settlement is a decision like any other and leaves the record the ownership section requires, so a profile returns to Profile carrying who approved it and why.

Project-local gates cover what no profile does. A project needing a check the catalogue has never seen gets one drafted by an agent and approved by the operator at skeleton review, where the whole contract is being read anyway.

One property makes that safe: a project-local gate may only add checks, never relax or replace a profile's. The profile is a floor an agent cannot lower, so the worst a weak draft can do is fail to catch something, never permit something the profile already refused. That is what stops "an agent can author gates" from meaning "an agent can author its way out of them".

Promotion closes the loop. A project-local gate that recurs across projects is promoted into a profile by the standards role at catalogue review, so the catalogue grows from what projects actually needed rather than from what somebody anticipated. A profile nobody could have written in advance is exactly the one worth having, and the only way to know which those are is to watch which local gates keep getting drafted.

The ratchet

stateDiagram-v2
    [*] --> Drafted: project-local gate drafted by an agent
    Drafted --> [*]: operator declines
    Drafted --> Local: operator approves at skeleton review
    Local --> Local: any agent ADDS a check
    Local --> Drafted: any edit to an existing check
    Local --> Proposed: standards role puts it up for promotion
    [*] --> Proposed: a profile, or a change to one, is drafted
    Proposed --> Profile: settled at catalogue review
    Profile --> Proposed: every change, an addition included
    Local --> LocalUnderReview: meta-finding, dismissal rate high
    LocalUnderReview --> Local: operator keeps it
    LocalUnderReview --> Drafted: operator retunes it
    LocalUnderReview --> Retired: operator drops it
    Profile --> ProfileUnderReview: meta-finding, or N slices declared
    ProfileUnderReview --> Profile: catalogue operator keeps it
    ProfileUnderReview --> Proposed: catalogue operator retunes it
    ProfileUnderReview --> Retired: catalogue operator drops it
    Local --> Retired: operator loosens or removes
    Profile --> Retired: catalogue operator loosens or removes
    Retired --> [*]

Retiring a gate goes only through an operator, the project's for a project-local gate and the catalogue operator's for a profile; every other exit takes the authority its scope and direction name, so a central profile's tightening and its promotion are the standards role's at catalogue review and never any operator's. Entering is free in exactly one direction and within exactly one scope, and the definitions are what make the ratchet hold: tightening means ADDING a check, never editing one, and the free addition is a project-local gate's alone. A brand-new project-local gate is drafted rather than activated and reaches Local only once the operator approves it at skeleton review. A profile reaches Profile only through Proposed, which is catalogue review, and so does every later change to one, whether it is an addition, an edit or a local gate being promoted.

The restriction to addition is deliberate, and it is the alternative to a mechanism that cannot exist. "Prove the replacement is stricter than what it replaced" is undecidable for arbitrary checks, so a monotonicity check over edits would be a claim the system could not keep, and an agent blocked by a gate could rewrite it into something weaker that still passes for a tightening. Addition needs no such proof: a gate configuration that only ever grows admits strictly less than it did before, which a diff shows and nothing has to infer.

So an edit to an existing check is not a tightening at all. It goes back for the same approval a new gate takes, to Drafted for a project-local gate and to Proposed for a profile, because replacing a check is indistinguishable from relaxing one without reading both. A gate that blocks work is doing its job; an agent that could rewrite it would.

An addition to a profile takes that same route for a different reason. It is a genuine tightening, so nothing has to be proven about it, but it is one every project declaring the capability inherits, and a project's operator approving work for projects they cannot see is the two-owner shape rather than the free direction. Catalogue review is where that reader exists.

The review states are per scope for the same reason. A gate under review leaves it as whatever it entered as, so a project-local gate the operator keeps is still project-local and a profile the operator keeps is still a profile. One shared state with two unconditional exits would let a review promote a local gate, or demote a profile, without either passing the door its own scope requires, which is the ownership this section just established being undone by the state that watches its health.

A review ends three ways, not two, and the third is why keeping and dropping do not cover it. Kept, the gate returns unchanged. Dropped, it retires. A retune is a CHANGE, and a change takes the door its scope already has: back to Drafted for a project-local gate, back to Proposed for a profile, lowering N included. Routing one straight to Retired would let a review rewrite a gate on its way out, which is the one move the ratchet exists to refuse, and it would do it under the label that sounds most like maintenance.

Gates are memories of mistakes

Every gate exists because something went wrong once. A defect whose root cause is a class of mistake rather than an instance ships with the gate that would have caught it. This is the existing convention-rollout rule generalised past conventions: the investigation that found the defect proposes the gate.

Where a lesson is mechanical it becomes a gate. Where it is judgement it becomes a line in a brief or a class of finding. Nothing that was learned stays only in a transcript.

Meta-findings

A gate that fires and is repeatedly dismissed is a defect in the gate.

Dismissals and true positives are counted per gate. A gate whose dismissal rate crosses its threshold raises a meta-finding proposing a retune, which an operator settles. This is measurable, so nobody has to notice by hand that a check has stopped earning its cost.

Thresholds are tiered rather than flat. A single number applied everywhere flags the harmless and passes the harmful; a gate declares what property it proxies for and both of its failure modes.

Retiring a profile

The dismissal rule above is per gate and per project. A whole profile that has stopped earning its cost is a different question, because it charges every project declaring that capability, and no single project accumulates enough evidence to judge it.

Two triggers, and the second is the one that matters. A profile raises a catalogue-level meta-finding when its gates are dismissed across many projects, exactly as a single gate does. It also raises one every N slices that declared its capability, so the review arrives on accumulated use rather than on a calendar.

N is a field of the profile itself, not a global, because a profile that charges four checks and one that charges forty do not earn the same review rate. A profile that states no N gets 50, so the ordinary case of nobody having an opinion needs no decision. A profile that states one must state a positive integer, and anything else, zero, a negative, a non-integer, is refused rather than run at some inferred rate. The order is what makes that unambiguous: the default is applied first, and validation then runs on the value the profile actually carries, so exactly one behaviour is reachable for each case. It matters because the trigger is machine-computed, and a profile with no usable cadence is the one profile nothing ever reviews, silently, which is the failure this whole section exists to catch.

Being a field of a central profile, N changes where every change to it goes, at catalogue review, and the ratchet decides which of that venue's two seats settles it. Raising it reviews the profile less often, which is a loosening, so the catalogue operator settles it and the standards role brings it; lowering it reviews more often, which needs nobody's permission and no proof, so the standards role settles that itself. Naming "the operator" is not enough here and saying so is the point: the operator of one project is not the operator of the others a profile charges, and a cadence is precisely the field a project blocked by a profile would want turned down. The count is over slices declaring the capability, across every project, and it is reset by the review it triggers. Declaring rather than running is deliberate: a slice that declared the capability paid for the profile's gates whether or not any of them fired, and counting fires would make the profile least examined exactly where it is most inert.

The unit is deliberately work rather than time. A cadence in days reviews a repo that has been idle for a month and under-reviews one running hundreds of sessions a week, and neither has anything to do with whether the profile is still right. Counting declarations makes the review rate proportional to how much the profile is actually costing: a heavily-used profile is examined often, and a profile nobody declares is never examined at all, which is correct because it is charging nobody.

Retiring a profile is the catalogue operator's, like every other loosening of one.

The finding channel

One stream, one shape, and every producer on it. A lint error already carries a file and a line; so does a failing test frame; so does a reviewer's observation. The author works from one list and does not care which produced each entry.

Seven things raise findings, and the list is exhaustive because a producer with nowhere to write is a failure path nothing reports: the gate runner, the trunk gates on a merge that goes red, the reviewer, the builder itself when it discovers it cannot proceed, the standards role on a machinery-budget breach, the operator looking at an increment, and the meta-finding rule when a gate's dismissal rate crosses its threshold or a profile comes due for review.

The last one is on this list rather than beside it because it is a finding about the machinery instead of about the software, and a channel that carried only the second kind would leave the first with nowhere to go. That is the failure the standards role exists to catch, so routing it anywhere else would be building a second stream to avoid naming this one.

Classes

Class Meaning Lands on
defect this unit is wrong the author
contract-wrong the skeleton cannot express what is needed the skeleton owner
blocked-by-fact a fact the plan assumed is false reconnaissance, then the slice planner
scope-conflict two units both claim the same ground the slice planner
misaligned it works, and it is not what was wanted the charter, then the slice planner
re-slice the plan is wrong and nothing built is affected the slice planner
meta-finding a gate or a profile has stopped earning its cost the operator, via the standards role
needs-human a question only the operator can settle the operator

blocked-by-fact is the one the loop as built cannot express at all. It is what an agent four levels deep has when it discovers the library cannot do the thing the whole approach rests on, and today it has nowhere to go: every channel that exists is anchored to a diff, and this finding is raised before one. The typed targets below are what give it a home, as a plan target routed to reconnaissance and then the slice planner, on the same stream as every other finding rather than beside it.

Anchoring

A finding carries a typed target, and the type decides what anchoring means. Requiring a path and a line range of every finding would be requiring one of findings raised before any diff exists: blocked-by-fact is what reconnaissance has when a fact turns out to be false, and a budget breach or a misaligned verdict is about a record rather than a line.

Target Names Anchoring
code a path and a line range must fall inside the diff under review
slice a unit or a slice the unit id
plan the slice plan the plan id
charter an acceptance criterion the criterion
decision a recorded decision the decision id
gate a gate or a profile the check_id, or the profile_id

For a code target the diff bound is not presentation. A finding pointing outside the diff is about code this unit did not write and is subtracted automatically, the same way an output-policy guard subtracts findings a file already carried. The other five have no diff to be subtracted against, which is exactly why they need a target of their own: a pre-diff finding forced into a code shape has to invent a path, and an invented path is subtracted by the rule above and vanishes.

Convergence

Findings are keyed on (target, severity, criterion), where the target carries whatever identifies it: a path and line range for code, an id for the rest. That makes rounds comparable without making a line number a requirement of findings that never had one.

flowchart TD
    R1[round n findings] --> CMP{compare with n+1}
    CMP -- fewer, no new blocking --> CONV[converging: continue]
    CMP -- blocking set unchanged --> STALL[stalled: stop]
    CMP -- same size, different set --> THRASH[thrashing: stop]
    CONV --> R1
    STALL --> EX{oversight mode}
    THRASH --> EX
    EX -- full --> FAIL[unit fails]
    EX -- supervised or stricter --> ASK[operator decides]

A fixed round count cannot tell those three apart, and thrashing is the one it is blind to: an author fixing one thing while breaking another produces the same number of findings every round and never converges.

A hard ceiling remains as a spend backstop. The normal exit is the progress test, and the loop records which ended it, because running out of budget and ceasing to converge are different diagnoses.

A unit is never silent

A unit is in exactly one of three states. There is no fourth, and there is no absence of state.

State Meaning
RUNNING Working, heartbeat current
BLOCKED(reason) Waiting, and naming what it waits on
terminal DELIVERED, FAILED, LOST or ABANDONED, each with an outcome record

BLOCKED carries a typed reason that names its subject: awaiting-operator names a finding, awaiting-dependency names a sibling unit, awaiting-gate names a check, awaiting-capacity names a budget. A reason naming nothing is refused at the transition, because "blocked on something" is the state this exists to eliminate.

Silence is a transition, not a state. A unit that stops reporting without reaching a terminal state and without declaring a block is marked LOST once its heartbeat lapses. LOST is terminal and it is a failure rather than a pause: it carries an outcome record like every other terminal, naming the last heartbeat and the lapse that ended it. It is kept distinct from FAILED because the two are different diagnoses. A FAILED unit reported why; a LOST one reported nothing, so the investigation it triggers is into the runner rather than into the work.

Without that, every other property here is defeated by a unit that simply stops: the slice waits on something that will never report, and the loop reads as working. It is the same defect as an agent declaring itself done, inverted. One asserts an outcome it did not earn; the other asserts nothing at all; both leave the system unable to tell success from absence.

Every blocked unit and the subject it names is readable per slice, so "what is this run waiting on" is answered without reading a log. Time-in-wait is measured per reason and enters the machinery budget, and a unit blocked past that budget raises a finding owned by the party that owns the blocker, never by the unit that has been waiting.

The machinery budget

Nobody watches the tools unless something is watching the tools.

Every gate run records duration and cost against its content-addressed key. A slice carries budgets: wall clock for its gate suite, tokens per delivered unit, rework rounds, cache hit rate.

A budget breach is a defect with an owner, not a cost to absorb. When a gate suite outgrows its budget the gate configuration is what is wrong, and the finding belongs to the standards role rather than to whichever unit happened to trip it.

The same organ answers the questions nobody else asks: whether the tests have become slow, whether spend per delivered unit is drifting, whether the cache is being missed, whether rework rounds are climbing.

Autonomy, and what reaches a human

An operator cannot be assumed to read code. What reaches them is never a diff: it is plain language plus the running software.

The ladder is over decision classes, not artefacts.

Decision class locked supervised semi full
Scope human human human human
Irreversible or outward human human human human
New dependency or external call human human automatic, logged automatic, logged
Contract shape human human, as prose agent agent
Code quality human gates and agent gates and agent gates and agent
Merge human automatic when green automatic automatic
A stalled review human human human unit fails

Scope and irreversible actions stay with the operator at every level, full included. That is what makes full safe to offer.

At supervised a skeleton is presented as prose: what the software will do, which dependencies it gains, whether it reaches anything outside. Not a diff.

Who investigates

Nobody investigates today. A failure becomes a status and the loop moves on.

An investigation is dispatched automatically on the second failure of anything: a unit that failed twice, a trunk that went red twice on one interface, a gate that fires without being understood. Its output is a finding, never code, and its cost is one session.

The alternative is what the current loop does, which is to hand a failure to whoever is next and hope.

The failure classes this answers

The design is not derived from first principles. It is derived from a corpus of recorded corrections: 285 written-down lessons and 127 substantial session transcripts, 223 MB in total, of one operator supervising agents on this codebase. Every class below is a thing a human had to say out loud, usually more than once, and each names the mechanism that removes the need to say it again.

The dominant one, by a wide margin

An agent deciding for itself that it is finished. It is the top or near-top theme in every batch of transcripts independently, and the largest single count in the corpus: 51 sessions ended with work left unfinished. It is also the only class that reliably produces profanity.

The mechanism the operator arrived at on their own is the right one, and it is structural rather than a matter of diligence: there is no "done" an agent can declare. Done is computed. A unit reaches a terminal state when its contract test passes and it broke nothing else, and a unit that stops anywhere else has failed rather than finished. Stopping is not an outcome, so it cannot be mistaken for one.

This generalises past stopping, and once stated that way it absorbs most of the rest of the corpus:

Every stage transition carries machine-checkable conditions on both sides, and the transition is performed by the system rather than asserted by the party doing the work.

The classes, and what each demands

Class What it looks like Mechanism
Self-declared completion Work stops mid-flow, or "done" is announced with objectives outstanding No agent-declarable done; a terminal state is computed from the contract test
Premature advancement A stage opens before its prerequisites hold: a PR opened before every agent reported, a merge landing on a review still in flight Each transition is gated on a checkable precondition, re-read immediately before the transition rather than earlier in the turn
Verification honesty A setting is changed, it parses, success is reported, and the value never reached the wire The system runs every deterministic check; an agent-reported result is never evidence
Asserted completeness "We are done" with scheduled jobs unaccounted for, or a partial list where a full one was asked for The complete set is derived, never enumerated by the party reporting on it; an unaccounted member fails the check
Unauthorised action Issues filed, pull requests opened or closed, implementation begun, scope reduced, none of it asked for Outward and irreversible actions stay with the operator at every autonomy level; scope is never reduced by the party doing the work
Procedure drift A written procedure is loaded and then not followed A procedure expressed as prose can be drifted from; the same procedure expressed as gates and preconditions cannot. This is the argument for the whole mechanical split
Silent waiting A unit blocked on something says nothing, and is indistinguishable from a unit that has died A blocked unit names its blocker in a readable state. Silence is not a state, and time-in-wait is budgeted
Lost decisions A settled question is re-opened, or previously approved wording is silently replaced Decisions are durable and addressable; re-opening one is an operator action
Duplicated work The same check is run locally that the gate will run again, or a rate-limited reviewer is pinged inside its window Content-addressed results keyed on (check_id, tree_sha, config_sha); a check already run on this tree is read, not repeated
Workaround before diagnosis A bypass is offered for a failing gate instead of the gate's cause being found Investigation dispatched automatically on the second failure of anything; its output is a finding, never code
Unbounded parallelism Enough concurrent work is launched to exhaust the host Concurrency and spend are budgeted per slice, and the budget is a precondition of dispatch
Machinery health Nobody notices the checks have become slow or stopped earning their cost The machinery budget, and the meta-finding on dismissal rate
Change amplification A route added in the right file and the wrong registry: it type-checks, it lints, it passes every gate, and it serves 404 The gate config is part of the contract, so a capability declares the whole set of artefacts that must move together
Knowledge loss The same trap is rediscovered every session A mechanical lesson becomes a gate, a judgement one becomes a line in a brief. Neither stays only in a transcript
Late defect discovery Core defects in planning, reconciliation and delivery keep surfacing during live runs rather than before them Reconnaissance establishes the facts and the skeleton proves the contract compiles, both before any leaf builds on either
Lost vision Design decisions accumulate until nobody can say which problem they serve: "what is the goal. i lost the vision. does it make sense?" Every decision cites the charter objective it serves. A decision citing none is itself a finding
Unsolicited output Deliverables produced that nobody asked for A unit produces what its contract declares. Anything else is out of scope by construction
Ceremony without value The route from finished work to landed work feels heavier than the work: "why is it so complicated for the agents to submit work?" The internal review object is local (base, head, diff, gate results, verdict). No forge, no network, no external account

Two of these were reproduced while writing this page, which is the argument for taking them seriously rather than a coincidence worth mentioning.

A fan-out of seven agents shared one helper script. One agent rewrote it with a version that read the wrong field, so it emitted nothing. Six agents hit the resulting empty output and reported nothing wrong; one escalated and asked whether the input was the right shape, and that single escalation is the only reason the defect was found before every agent returned a confident, empty answer. Six of seven treated a broken tool as a clean result.

The same script then crashed part-way through each file on an encoding error, truncating its output. A partial crash and a genuinely empty file are indistinguishable to the caller.

Both are the same shape, and it is the shape the loop must refuse: a check whose failure is indistinguishable from its pass. Every gate here therefore reports three outcomes rather than two, and an outcome that cannot be established fails closed. Shared mutable state between concurrently-running units is refused for the same reason: a unit that can damage a sibling's inputs produces a result that reads exactly like a measurement.

What is deleted

  • The assembly agent and the reconstruct-by-reading merge.
  • Whole-tree planning in one pass.
  • Depth as a configured parameter.
  • The fixed rework-round count as the only exit.
  • Agent-reported build and test results as evidence.

What this costs in enforced rules

Two MANDATORY rules in CLAUDE.md are contradicted by this design. Stating that here is the point: a design page that silently conflicts with an enforced rule leaves the next contributor to find out at the gate, which is the change amplification class catalogued above.

Verified Initiative Completion. The rule requires INTEGRATING, a gated root assembly task, before EVALUATING, and is enforced by check_verified_completion_paths.py. Assembly stops being a stage here, so INTEGRATING has nothing left to represent and no root assembly for its provenance rule to identify. EVALUATING survives untouched, and what the rule exists for, that an initiative cannot complete straight out of execution without the whole thing having been run and judged, is carried by the trunk invariant and the per-slice boot instead. The assembly stage goes; the verification it carried does not.

Dependency-Gated Waves. The rule derives its population from the modules calling build_execution_waves and mandates four parking calls, with no baseline and no opt-out. Slices replace waves, so that derived population empties. Every question those calls answer is still live and still needs one owner: a unit whose declared inputs failed must not dispatch, a unit awaiting a person must be held without being recorded as failed, a run that stops must leave no row that nothing will move, and a unit routing could not place must not sit invisible. Each of those exists because a live run left rows with no exit, so they are restated against the new shape rather than dropped because the vocabulary changed. Re-planning each slice against the current trunk makes them easier to satisfy, not unnecessary.

Unaffected, and depended upon: Roster-Held Gate Roles, whose reviewer selection and no-self-review constraints this design relies on unchanged. Strengthened: Single-Owner Decisions. The ownership table and the decision registry are that rule applied to this loop.

What no gate can catch

A slice can pass every deterministic check, satisfy its contract, survive review, merge clean and boot, and still not be what was wanted. No gate catches that, because the gates check the work against the contract and the contract is what was wrong.

The reviewer cannot catch it either. It judges the diff against the criteria it was handed, and those came from the same misunderstanding.

The only detector is a person looking at something running. That is what the booting increment is for, and it is why the increment is a stage rather than a nicety. Everything else in this loop can be checked by machine; this cannot.

Two consequences follow, and they are the reason slices are sized the way they are:

  • The first slice produces something that boots. Not scaffolding, not a library with no caller, not a data layer nobody can see. Something the operator can look at and recognise, or fail to. Wrongness then surfaces at slice one instead of slice forty.
  • A slice is sized to be disposable. Its size is chosen by how much work you are willing to have built wrong, because that is exactly what is at risk between one increment and the next.

An operator who looks at an increment and does not recognise it raises a misaligned finding. It never routes to the author: the code did what it was asked, and what it was asked was wrong. Raising it is a scope decision, so it is the operator's at every autonomy level.

Where it routes is derived, not judged, from which units the changed criteria reach:

What the changed criteria touch Class Owner
Only slices not yet built re-slice the slice planner
Any unit already merged to trunk contract-wrong the skeleton owner

The split matters because the two cost wildly different amounts. Re-slicing discards a plan; a contract change discards work that is already on the trunk and green. Deriving the class from the affected set rather than asking someone to estimate it keeps a cheap re-scope cheap, and stops an expensive one being filed as a cheap one by whoever wanted it to be.

Open questions

  1. None of this is validated by a completed run. The design is reasoned from measured failures rather than proven by a success: driven live, the loop it replaces has never reached assembly. Every mechanism here is a hypothesis about a defect that was observed, not a technique that has been seen to work.
  2. Slice sizing has no rule. "Sized to be disposable" is a principle, and the number is the one knob deciding how much gets built wrong between one increment and the next.
  3. The first skeleton has nothing to check it against. The booting increment is the only detector of work that is correct and unwanted, and the first contract is written before any increment exists, so the riskiest moment in the loop carries the least protection. The likely answer is that slice one is required to be the thinnest end-to-end path that boots, so the contract meets a person before anything is built on it, but that is a claim about sequencing that nothing here has tested.