Initiative Tail

The two stages between "every plan item is done" and delivery, and the driver that replans an initiative which can no longer advance.

Project Lifecycle owns the graph and the rollup that opens this tail; Plan Review owns everything before dispatch.

The problem

The general loop ran plan, execute, verify and then stopped. Every plan item passing its own review gate completed the plan, the project, and the objective.

That is a real guarantee about each piece and no guarantee at all about the whole. An initiative could deliver a set of individually-verified parts that nobody had ever assembled, run together, or checked against what the objective actually asked for, and the board would show it as delivered. Three smaller leaks kept that from even being reliable per piece:

  • a WORK plan item could declare zero expected artifacts, which disarmed the fail-loud zero-artifact guard, so a chat-only run with no output reached review as though it had produced something;
  • the lifecycle-only baseline execution service walked any task straight to COMPLETED, gate or no gate;
  • the coordination parent rollup derived subtask status from run outcomes, which report success before verification.

Shape

stateDiagram-v2
    EXECUTING --> INTEGRATING: every item done
    INTEGRATING --> EVALUATING: assembly job passed its review gate
    EVALUATING --> COMPLETED: every success criterion met
    INTEGRATING --> EXECUTING: an item regressed
    EVALUATING --> EXECUTING: an item regressed
    INTEGRATING --> SUPERSEDED: replan
    EVALUATING --> SUPERSEDED: replan

EXECUTING -> COMPLETED does not exist. Neither does the project's ACTIVE -> COMPLETED. Delivery has exactly one predecessor in both machines, so the tail cannot be skipped by construction rather than by whichever service happens to be wired. The back-edges carry a regression: an item that stops being done (integration findings routed back as rework) reopens the build without a replan.

INTEGRATE

engine/initiative/integrate.py mints one ordinary task and dispatches it through the normal work pipeline.

Making it an ordinary task is the whole design. It inherits the entire existing verification chain with no second oracle written for it: the review gate runs run_completion_gates, so the build/test oracle reads its CodeExecutionRecord rows and refuses an unverified or failing build, the completion-oracle peer review fails closed without a distinct reviewer, and output policy, red team, and vision all apply. A bespoke "integration checker" would have been a second, weaker gate.

Three shape decisions carry weight:

decision why
forced LEAF (WorkItem.leaf_required) splitting an assembly job hands the pieces back to separate agents, which is the state the stage exists to end
plan_id set, plan_item_id unset it belongs to the initiative without implementing any plan item, so every derivation over items ignores it and it cannot distort the rollup that opened the stage
id derived from the plan id (uuid5) idempotency with no "already started" flag to drift from reality: a re-fired stage finds the existing row and stops

It declares two expected artifacts, the integrated runnable deliverable and the end-to-end test run over it, which arms the zero-artifact guard: an integration that produced neither terminates NO_OP -> FAILED rather than reading as finished. It runs one stakes level above the plan's highest item, because assembly is the first point the whole thing runs and the last point before delivery. Its acceptance criteria are the objective's own.

Outcome, read from the task's persisted status on the next rollup recompute:

  • COMPLETED (so the gate passed it): plan INTEGRATING -> EVALUATING;
  • FAILED / REJECTED / CANCELLED: the replan trigger fires with INTEGRATION_FAILED;
  • anything else: still working, nothing happens.

EVALUATE

engine/initiative/evaluate.py runs a bounded session in which the accountable lead judges the delivered whole against the objective's success criteria. It is modelled on the SHIP retrospective session: detached, wall-clock bounded, turn and cost capped, never raising into the rollup.

The verdict is per-criterion and evidenced (EvaluationReport), not a single thumbs-up. Two invariants make it load-bearing:

  • every criterion is judged exactly once. A submission that drops one, or invents one the objective does not have, is rejected back into the session for correction rather than accepted with the unanswered criteria treated as met;
  • PARTIAL is not a pass. An initiative is delivered when the objective is met, not mostly met.

The session's tools are read-only by design (workspace read and list). A session that could change what it is judging could turn its own failing verdict into a passing one.

Fail closed

No report, an unresolvable lead, no provider, a timeout, an objective with no criteria: every one of those leaves the plan sitting at EVALUATING with a warning on each recompute. Nothing completes an initiative on a missing verdict.

This is the deliberate inverse of the red-team gate's policy, and it is the point of the whole change: an evaluation that did not happen is not a pass. An operator resolves a parked plan by replanning or cancelling.

Auto-replan

replan_initiative was fully built and reachable only from a human POST /plans/{id}/replan. Nothing noticed when an initiative ran out of ways to advance, so a stalled plan simply hung until someone looked. engine/initiative/replan_trigger.py is that missing driver. The successor lands in PENDING_REVIEW, which is the human gate the product already has: the organisation gets itself unstuck, the operator still decides.

What counts as stalled

A shape, not a duration: the plan has outstanding work and none of it can move without a new decision. There is no threshold to tune and no timer, and the derivation is exact the moment the last live item dies.

Three cases are deliberately excluded, each because replanning would destroy something:

not a stall why
work still moving (CREATED through IN_REVIEW) it is simply in flight
a human wait (AWAITING_INPUT, AUTH_REQUIRED) the org is waiting on the operator; a replan would discard the question rather than answer it
an item whose task row does not exist yet dispatch writes the plan's EXECUTING status before it creates the task rows, so treating this as dead would replan every initiative during its own dispatch window

The two tail stages produce verdicts no derivation over items can see (every item is COMPLETED when integration fails), so INTEGRATION_FAILED and EVALUATION_UNMET are carried in by the stage and re-confirmed by the plan still sitting in the stage that produced them.

Loop safety

Plan.replan_generation counts how many times an initiative has replanned itself. A successor opened automatically carries its predecessor's generation plus one; a human replan resets it to zero, because a human decision is not a runaway. Past engine.auto_replan_max_generations the initiative is parked, not failed: it keeps its status and its stall stays visible for an operator.

Every fire re-reads the plan and re-confirms the stall before doing anything, which is what makes a redelivered rollup event harmless: the first replan supersedes the plan, and every later attempt reads a superseded plan and stops.

Degraded boots

Each collaborator degrades independently, and none of them degrades into a completion:

unwired behaviour
integrate stage (no work pipeline) plan parks at INTEGRATING, WARNING per recompute
evaluate stage (no provider) plan parks at EVALUATING, WARNING per recompute
replan trigger (no coordinator) a stalled plan stays stalled and visible

Parking is the honest outcome: an initiative whose pieces were never assembled has not delivered, and an initiative nobody scored has not been shown to meet its objective. The operator's remedy is one the product already has: replan (legal from both tail stages) or cancel.

Wiring is best-effort and re-runnable. The rollup is wired as soon as persistence and the task engine exist, which is before setup has configured a provider, so a first boot legitimately produces a rollup with no tail; re-running the wiring after setup attaches whatever now resolves, without re-registering the observer, so the tail comes online with no restart.

Settings

All hot-reloadable, read per fire, so none is restart-required.

key default purpose
engine.auto_replan_enabled true master switch for the stall trigger
engine.auto_replan_max_generations 2 generation cap stopping a runaway chain
engine.auto_replan_timeout_seconds 600 ceiling on one re-decomposition
engine.integration_stage_timeout_seconds 1800 ceiling on minting + dispatching the assembly job
engine.evaluation_session_max_turns 10 evaluate session turn cap
engine.evaluation_session_cost_ceiling 1.0 evaluate session spend ceiling
engine.evaluation_session_timeout_seconds 300 evaluate wall-clock ceiling

Enforcement

scripts/check_verified_completion_paths.py (pre-push + CI) holds up the three structures this page depends on: the forbidden edges stay forbidden and COMPLETED keeps exactly one predecessor in both machines; only the evaluate stage writes PlanStatus.COMPLETED; and both plan-shaped models still enforce that a WORK unit declares a deliverable. Opt out per-line with # lint-allow: verified-completion -- <reason>.